For quantity surveyors

AI for quantity surveyors: the take-off and the BoQ, with the working shown.

Quantity surveyors price from drawings they did not draw. detumble reads the structural AutoCAD set (DWG or DXF), measures a material take-off from a 3D model of what is drawn, maps it to a bill of quantities, and keeps every assumption as a query. Every line links to the sheet, the schedule row and the note it came from; you accept, correct or reject it.

Who it is for

The steps

  1. 01

    Read the set

    The whole structural set is read once: sheets, layers, schedules and notes, checked against the drawing. Conflicts are kept as queries, never silently resolved.

    Ask in your own words, or type /ingest

  2. 02

    Measure

    Concrete, formwork, excavation and steel per element, measured by repeatable arithmetic from the confirmed reading, each quantity with its evidence.

    Ask in your own words, or type /takeoff

  3. 03

    Map the bill

    The accepted take-off becomes a bill of quantities: each take-off line is mapped to a bill item from a code library, and the mapping is shown line by line.

    Ask in your own words, or type /boq

What you get

  • Material take-off workbook with rebar, per element
  • Bill of quantities mapped to the take-off
  • RFI register: every assumption and what closes it
  • The IFC model the quantities were measured on

The proof

Evidence on every quantity
sheet, row, note, crop
Paid runs quoted before they spend
every one
Final without your acceptance
nothing

Every figure names its scope; none is a promise for every drawing set.

Questions

Does it replace the quantity surveyor?
No. It does the measuring and shows its working; the QS decides. Nothing advances without an engineer's acceptance at a review gate.
How long does a take-off take?
It depends on the set. The reading runs at the highest quality and is quoted before it starts; the quote says how long a run like it usually takes, and the run shows its progress while it works. The take-off is quoted the same way on the confirmed reading, and the bill of quantities follows from it.
Which standard does the bill follow?
The bill maps take-off lines to items in a code library. Tell us the measurement standard you price to; it shapes which libraries we build next.
Can it read PDF tender drawings?
Not for a take-off today. detumble reads AutoCAD DWG and DXF sets, or a zip of either; PDF sets are on the roadmap.
What does it cost?
Plans start at $199/mo per estimator. Every paid run is quoted before it spends a credit and runs only when you approve; you pay only for the work a run really did.